CENER VRB

Technology Type Vanadium Redox Flow Battery
Rated Power 50 kW
Duration at Rated Power (HH:MM) 0:15.00 / 2.00
URL More about CENER VRB
Smart grid application- severe single phase loading requirements 100% imbalance per phase- wide frequency deviations Operated in a micro-grid to perform output leveling and time of day shifting Provides reactive energy voltage control dynamically The micro-grid will be both grid connected and islanded
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On DD.09.YYYY
Project Includes Multiple Systems No
Siting
Location

City of Innovation, No. 7
Sarriguren, Navarra 31621
Spain

ISO/RTO N/A
Utility Type
Paired Grid Resource
Paired Grid Resource Photovoltaic Demonstration
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Customer-Owned
Equity Owner 1 National Renewable Energy Centre (CENER)
Equity Owner 1 Percent 100%
Energy Storage Technology Provider Prudent Energy Corporation
Cost & Performance
Performance Performance metrics not available
Benefits
Service Use Case Electric Energy Time Shift
Renewables Energy Time Shift
On-Site Power
Onsite Renewable Generation Shifting
Microgrid Capability
Research Partner
Research Institution CENER (National Renewable Energy Centre)
Research Institution URL http://www.cener.com/en/