Dulles TES Tank for Internet Service Provider

Technology Type Chilled Water Thermal Storage
Rated Power 0 kW
URL More about Dulles TES Tank for Internet Service Provider
In 2006, a large Internet Service Provider (ISP) located in Dulles, VA selected DN Tanks to build a mission critical Thermal Energy Storage (TES) tank to service their data center. The data center which operates 24 hours each day could not afford the consequences that would result if their chilled water cooling system were to experience downtime. This TES tank, now our third built TES tank for this same ISP, was designed to provide back-up cooling for the central plant in the event that the chillers experience unexpected downtime. The engineer for the project, Dunlap & Partners, designed the revisions to the chilled water system which included the addition of a new TES tank. The tank was specified to be capable of storing enough chilled water equal to the peak cooling load for the facility for a period of two hours. In addition, the chilled water pressure drop through the tank was specified to stay below 3 psi even in the event that the pumps were to require a delivery flow rater of 5,184 gpm which is the maximum flow rate to the building. Poole & Kent, the mechanical contractor, provided the new chilled water piping, pumps, and valves in addition to overseeing the installation of this TES tank. DN Tanks together with Poole & Kent worked closely with the owner and engineers in ensuring that the TES system was constructed within the agreed upon schedule, and commissioned expeditiously so that the data center would be protected with this reservoir of chilled water. In August of 2007, representatives of the owner, the mechanical contractor, the engineer, and DN Tanks commissioned the TES system. The commissioning process included shutting down all chillers during the middle of a weekday of the data center operation. Immediately upon shutting down the chillers, the new TES system was energized and chilled water from the TES tank became the sole source of cooling for the facility. The system remained in this mode for 1 hour and 40 minutes, while the TES tank operated flawlessly.
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner.
Project Status
Status Operational
Commissioning On DD.08.YYYY
Project Includes Multiple Systems No
Siting
Location

Dulles, Virginia
United States

ISO/RTO PJM
Utility Type
Paired Grid Resource
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Third-Party-Owned
Equity Owner 1 Unknown (Internet Service Provider)
Energy Storage Technology Provider DN Tanks
Cost & Performance
Performance Performance metrics not available
Benefits
Service Use Case Resiliency
Export Data PDF

Print to PDF

You may use your computer system's built-in dialog to obtain a PDF of this page through the Print menu. Print this page, then choose Print to PDF or Save to PDF near the bottom of the dialog box.

Print and Save to PDF

Export Data

Thank you for using the Global Energy Storage Database. Please provide your e-mail address to download the data. Upon filling out the form you will receive an email with a link to the full data set you requested.

Suggest Update

Thank you for using the Global Energy Storage Database. Please provide the following information to help us research your update to this content.