BESS Neuhardenberg

Technology Type Lithium Iron Phosphate Battery
Rated Power 5000 kW
Duration at Rated Power (HH:MM) 0:15.00 / 1.00
URL More about BESS Neuhardenberg
Work is performance times. In the frequency-controlled power output of the PRL, it is important to follow the fluctuating frequency to the second. This happens in the energy storage Neuhardenberg in parallel and independently in 20 converters, which are each equipped with their own frequency control. 4 of these inverters are combined on one transformer. Combined with an active battery management system (BMS), which ensures the necessary energy balance at the cell level, this results in an extremely robust and fail-safe complete system of maximum efficiency.
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On DD.04.YYYY
Project Includes Multiple Systems No
Siting
Location

Oderbruchstraße 24
Neuhardenberg, Brandenburg 15320
Germany

ISO/RTO N/A
Utility Type
Paired Grid Resource Primary Distribution
Paired Grid Resource 145 MW Solar Plant
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Customer-Owned
Equity Owner 1 Upside Services GmbH
Power Electronics Provider Siemens
Cost & Performance
Projected Project Lifetime 15 years
Performance Performance metrics not available
Benefits
Service Use Case Frequency Regulation
Research Partner
Research Institution Fraunhofer IFF Magdeburg