Tallaght Smart Grid Testbed: Lithium Ion Battery

Technology Type Lithium-ion Battery
Rated Power 300 kW
Duration at Rated Power (HH:MM) 0:15.00 / 0.50
URL More about Tallaght Smart Grid Testbed: Lithium Ion Battery
Ireland intends to achieve 40 percent renewable energy by 2020. Most of this electricity comes from large-scale wind farms with only limited connection to the UK. FREQCON deployed Ireland's first combined ultracapacitor & energy storage facility for the Tallaght Smart Grid Testbed in South Dublin County. The 300 kW / 150 kWh system was developed to demonstrate that a combination of lithium-ion batteries, Maxwell Technologies ultracapacitors, and FREQCON power converters can deliver what is needed.
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On DD.02.YYYY
Project Includes Multiple Systems No
Siting
Location

Dublin, Leinster
Ireland

ISO/RTO N/A
Utility Local Authority - South Dublin County Council
Utility Type State/Municipal Owned
Paired Grid Resource
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Utility-Owned
Equity Owner 1 Micro Electricity Generation Association Of Ireland
Energy Storage Technology Provider Ecoult
Power Electronics Provider Freqcon GmbH
Developer Freqcon GmbH
Cost & Performance
Performance N/A
Benefits
Service Use Case Electric Energy Time Shift
Electric Supply Reserve Capacity - Spinning
Frequency Regulation
Grid-Connected Commercial (Reliability & Quality)
Renewables Capacity Firming
Voltage Support