Southern Grid Baoqing Plant Phase-2 (南网宝清电站项目一期工程-2)

Technology Type Lithium Iron Phosphate Battery
Rated Power 1000 kW
Duration at Rated Power (HH:MM) 0:15.00 / 4.00
URL More about Southern Grid Baoqing Plant Phase-2 (南网宝清电站项目一期工程-2)
With the backdrop of hefty growth of power demand in Longgang area, Shenzhen City, the gap between peak and valley is getting more and more serious. The project is mainly used to achieve distribution network load shifting, frequency and voltage adjustment, isolated island operation and many other grid applications. As the domestic first MW-class energy storage power station, it has operated stably for 2 years, and has a model significance and practical value. System Features:24 clusters in BMS, the total battery capacity: 1MW*3H,216 strings in a single cluster. System Configuration: BAMS(XP8341)*2/BCMS(VP25W1)*24/HVC*24/BMU*432 (PW1005)
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Project Includes Multiple Systems No
Siting
Location

Longgang, Guangdong
China

ISO/RTO N/A
Utility China Southern Power Grid
Utility Type Federally Owned
Paired Grid Resource
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Utility-Owned
Equity Owner 1 China Southern Power Grid
Energy Storage Technology Provider CALB
Integrator Company Sifang
Cost & Performance
Performance Performance metrics not available
Benefits
Service Use Case Electric Energy Time Shift
Electric Supply Capacity
Frequency Regulation
Ramping
Voltage Support