With the backdrop of hefty growth of power demand in Longgang area, Shenzhen City, the gap between peak and valley is getting more and more serious. The project is mainly used to achieve distribution network load shifting, frequency and voltage adjustment, isolated island operation and many other grid applications. As the domestic first MW-class energy storage power station, it has operated stably for 2 years, and has a model significance and practical value.

System Features:24 clusters in BMS, the total battery capacity: 1MW*3H,216 strings in a single cluster.
System Configuration: BAMS(XP8341)*2/BCMS(VP25W1)*24/HVC*24/BMU*432 (PW1005)


Lithium Iron Phosphate Battery