Tes_ait_baha

Airlight Energy has recently completed construction of the Ait Baha CSP plant in Agadir, Morocco. Estimated to produce 2,390 MWh/yr, the plant is owned by Italgen Maroc. The plant is designed to recover waste heat from the cement factory and provide additional heat at higher temperature to the existing 12MW ORC Generator. It uses a pebble stone storage system.


Heat Thermal Storage


650

9:00.00