Pu Neng, the leading provider of vanadium flow battery technology in the world, has been awarded a contract for a 3-megawatt (MW) 12-megawatt-hour (MWh) VRB as Phase 1 of the Hubei Zaoyang 10MW 40MWh Storage Integration Demonstration Project. This first phase will be installed in Zaoyang, Hubei to integrate a large solar photovoltaic system into the grid.

Installation of the VRB system will commence in November 2017. When Phase 1 is completed in early 2018, Pu Neng’s VRB will be the largest flow battery installed in China. As part of the initial agreement, Pu Neng and Hubei Vanadium will jointly develop a vanadium electrolyte supply from local vanadium sources, helping revitalize the local industrial base to meet future demand for energy storage.

Flow batteries store energy in liquid electrolyte, which is held in tanks external to the cell stacks that contain the cathode (positive) and anode (negative) sides of the battery. When charging or discharging the battery, electrons are added into or drawn out of the electrolyte as it circulates across membranes inside the stacks. Unlike other types of batteries, vanadium flow batteries use the same electrolyte solution on both the positive and negative side of the battery, yielding a nearly infinitely repeatable electrochemical process.


Vanadium Redox Flow Battery


3,000

4:00.00