The project will be constructed on a portion of the existing San Gabriel Energy Facility site located in Pomona, California. The system is designed to provide four hours of discharge at the stated capacity throughout the 10-year term of the contract. The project is designed to offer the full contract capacity throughout the term with no degradation, based on an initial oversizing of the facility and a battery replenishment strategy.

The project is expected to be interconnected at an existing 66/12 kV SCE Substation.


Lithium-ion Battery


20,000

4:00.00