1maritimeplaza

Building owner Morgan Stanley Real Estate Investing hired SF-based Advanced Microgrid Solutions, to design, build and operate the project. The 500 kilowatt / 1,000 kilowatt-hour indoor battery system will provide One Maritime Plaza with the ability to store clean energy and control demand from the electric grid.

The technology enables the building to shift from grid to battery power to conserve electricity in the same way a hybrid-electric car conserves gasoline. The energy storage system at One Maritime Plaza will reduce the building’s peak energy demand by as much as twenty percent.

The project is expected to be completed by January 1, 2018.


Lithium-ion Battery


500

2:00.00