Vsun_busselton_vrfb

Installation of a GILDEMEISTER CellCube FB 10-100 at an agricultural property south of Busselton in Western Australia. The FB 10-100 can deliver 10 kW of power and stores 100 kWh of energy. It is a fully integrated containerised vanadium flow battery, and the first of its kind to be installed in Western Australia.

The CellCube is being installed along with a 15 kW solar PV system. Together, the system allows the client to store their unused solar energy and use it when solar power is unavailable. The storage capacity of 100 kWh means up to 10 hours of power can be provided. The client is expecting to be up to 90% self-sufficient for their power needs, but will remain connected to the grid.