Aborgini

EMC Solar Construction has been engaged to design and build a 100 kW solar PV power station with a 64 kWh battery system and a 110 kVA diesel generator at its new home base in Wedgefield, Port Hedland – an independent power system that would generate and store 100% of the electricity needs of PMMRAC’s offices, workshop and depot.


Electro-chemical


40

1:36.00