Woojin_industrial_2nd_factory

This energy storage project is located at Woojin Industrial Systems 2nd Factory in North Chungcheong Province. The system consists of 288 kWh (lead-acid) battery capacity combined with a 150 kW power conversion system. The installation will be utilized for voltage drop compensation, grid backup, and measuring for grid voltage sag/swell.


Lead-acid Battery


150

1:55.00