Dychów Hydro Power Plant

Technology Type Open-loop Pumped Hydro Storage
Rated Power 90000 kW
Duration at Rated Power (HH:MM) 0:15.00 / 0.00
URL More about Dychów Hydro Power Plant

The Dychów Hydro Power Plant uses water from the Bóbr River. The reservoir encompasses an area of 100 hectares and has a usable energy capacity of 3.6 million M^3. http://www.operator.enea.pl/bl... http://pl.wikipedia.org/wiki/Z...

This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status Operational
Commissioning On DD.09.YYYY
Project Includes Multiple Systems No
Siting
Location

Dychów, Bobrowice
Poland

ISO/RTO N/A
Utility Type Investor Owned
Paired Grid Resource Transmission
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Utility-Owned
Equity Owner 1 PGE Renewable Energy SA
Cost & Performance
Performance Efficiency of the pumping cycle to the level of 71% Estimate 80 GWh Annually
Benefits
Service Use Case Electric Energy Time Shift
Electric Supply Capacity
Export Data PDF

Print to PDF

You may use your computer system's built-in dialog to obtain a PDF of this page through the Print menu. Print this page, then choose Print to PDF or Save to PDF near the bottom of the dialog box.

Print and Save to PDF

Export Data

Thank you for using the Global Energy Storage Database. Please provide your e-mail address to download the data. Upon filling out the form you will receive an email with a link to the full data set you requested.

Suggest Update

Thank you for using the Global Energy Storage Database. Please provide the following information to help us research your update to this content.