Imperial Irrigation District (IID) is installing a large-scale battery system that will help integrate around 50 MW of solar generation capacity to the local grid. The project will involve the installation of a 30 MW / 20 MWh battery-based energy storage system with 92 kV interconnection. The IID battery will help the grid accommodate power from two large-scale solar projects, Midway III and SunPeak 2.

The facility, sited near the El Centro Power Plant Unit 3 Repower Project, will aid grid flexibility and increase reliability on the IID network by providing solar ramping, frequency regulation, power balancing and black start capability for an adjacent gas turbine.


Lithium-ion Battery


30,000

0:40.00