On March 15, 2013 Faku wind power farm 5MW/10MWh energy storage system (ESS), built by Dalian Rongke Energy Storage Technology Development Co., Ltd. (referred to as Rongke Power) connected successfully to the grid of Liaoning Liaoning Power Grid.

The system implementation began in August 2012. The system will be equipped with Longyuan Power's 50-MW Bewini wind farm to track the planned power generation and smooth the wind power output, thereby enhancing the ability of wind power to connect to the grid. In addition, it will also play an active role in transient wind power emergency response and transient voltage emergency support in the grid-connected operation of wind power to ensure that the overall operation of the power grid is safer and more reliable.

The station is located in Shenyang, Liaoning Province. It is supporting 10% of the 50MW power plant. Rongke power takes charge of design, manufacture, installation and debugging of the project.

The wind farm project covers an area of ​​about 16 square kilometers with a total investment of 450 million yuan and a scale of 50 MW wind power with a 5 MW / 10 MW full vanadium flow battery energy storage system. The demonstration project highlights technological innovation and economic rationality.


Vanadium Redox Flow Battery


5,000

2:00.00