Gcn_ssgu2_avis

Green Charge Networks' GreenStation demonstration consists of a Lithium Ion storage unit, a system controller, twenty-one Level 2 electric vehicle chargers, and a rooftop PV array. The GreenStation ensures that Avis has enough capacity to charge 21 EVs simultaneously, performs peak mitigation in the main building, and avoids utility service upgrades. The system is tied to a network operations center where loads are monitored and controlled in real time. The project is supported by a DOE Smart Grid Demonstration Grant.


Lithium-ion Battery


100

1:36.00