1 MW - PG&E Old Kearney Substation - Hecate Energy

Technology Type Lithium-ion Battery
Rated Power 1000 kW
Duration at Rated Power (HH:MM) 0:15.00 / 2.00
URL More about 1 MW - PG&E Old Kearney Substation - Hecate Energy
As part of PG&E's 75 MW Energy Storage Procurement announced December 2, 2015 - A 1 MW lithium-ion battery system will be installed for distribution deferral at PG&E's Old Kearney substation in Fresno. The contract was awarded to developer Hecate Energy.
This data has been validated by project staff through a review of publicly available information about the project, and verified by the project owner. Information is accurate as of 2016-04-29.
Project Status
Status De-Commissioned
Project Includes Multiple Systems No
Siting
Location

Fresno, California 93706
United States

ISO/RTO CAISO
Utility Pacific Gas and Electric
Utility Type Investor Owned
Paired Grid Resource Primary Distribution
Project Includes Multiple Systems No
Ownership & Value Chain Partners
Ownership Model Utility-Owned
Equity Owner 1 Pacific Gas and Electric (PG&E)
Cost & Performance
Projected Project Lifetime 10 years
Performance Performance metrics not available
Benefits
Service Use Case Stationary Transmission/Distribution Upgrade Deferral
Export Data PDF

Print to PDF

You may use your computer system's built-in dialog to obtain a PDF of this page through the Print menu. Print this page, then choose Print to PDF or Save to PDF near the bottom of the dialog box.

Print and Save to PDF

Export Data

Thank you for using the Global Energy Storage Database. Please provide your e-mail address to download the data. Upon filling out the form you will receive an email with a link to the full data set you requested.

Suggest Update

Thank you for using the Global Energy Storage Database. Please provide the following information to help us research your update to this content.