Img_7972-1024x682

Saft has been selected by Cowessess First Nation(CFN) to design, produce and install 2 Intensium® Max 20E lithium-ion battery systems as part of the High Wind and Storage Project near the City of Regina, Saskatchewan.

The grid‐connected ESS system will help optimize renewable wind power performance by increasing reliability and decreasing volatility by as much as 70 percent over the 15‐year lifespan of the system. The Li‐ion ESS includes a state‐of‐the-art, 400kW Power Conditioning System for use in conjunction with an 800kW utility scale wind turbine.

Check out the project video here:
https://www.youtube.com/watch?v=UE7varh2VZY

http://tinyurl.com/p5tc4pe


Lithium-ion Battery


400

1:52.00